Revitalization of the Salt Marsh Trail at The Wetlands Institute

​

Project Purpose: Restore drowning marsh, elevate the Salt Marsh Trail to protect educational program access,

plant native trees, shrubs and marsh grasses to stabilize the restoration area, restore and create high marsh and

transitional upland nesting areas for diamondback terrapins and coastal birds.

​

Brief Description: The project will restore nearly five acres of tidal salt marsh on the Scotch Bonnet Island marsh complex at

The Wetlands Institute and contiguous with the Cape May Coastal Wetlands Wildlife Management Area

(WMA) managed by NJFW. The project will raise the elevation of the Salt Marsh Trail and rebuild

drowning low marsh habitat that is being lost to mudflat and pool formation and contributing to the

destabilization of marshes. Our ecosystem-based approach will reduce carbon loss to the atmosphere

through marsh conversion and increase carbon storage through vegetation enhancement of open water and

mudflat areas. To maximize ecological benefits, we will elevate the trail by two to three feet, widen it to

increase native vegetation cover, increase carbon storage, and create new high marsh and transitional

upland areas specifically designed for diamondback terrapin nesting and coastal birds. When it is

completed, this project will also have created an important barrier to storm waves, conferring additional

resilience to the Institute campus using nature-based solutions.

​

The Salt Marsh Trail is central to achieving The Wetlands Institute’s mission to promote appreciation,

understanding, and stewardship of wetlands and coastal ecosystems through research, conservation, and

education. It was originally built in the late 1950s to access Scotch Bonnet Creek for planned

development; that development failed, and the Institute was founded in its place instead. Despite its

inauspicious birth, the fill created high marsh and upland habitats that became valued nesting and feeding

grounds for diamondback terrapins and several species of coastal birds. Today, the trail provides direct

access to the marsh for more than 17,000 visitors and 14,000 schoolchildren each year, but climate-driven

flooding is threatening its ecological and educational value. In 2000 the trail flooded only twice per year,

but in the past five years it has flooded more than 330 times – an average of 67 times per year - killing

trees, drowning nesting areas, and accelerating marsh loss through the conversion to mudflats and open

water.

​

The project is funded through an NJDEP Regional Greenhouse Gas Natural Climate Solutions Grant in the amount

of $2,749,883. The Borough of Avalon is donating clean fill from annual dredging in the borough in 2017 that is

currently stored in a confined disposal facility thereby returning the sediments to the marsh system. The RGGI

funding does not pay for the essential upland fringe trees and shrubs that support a healthy marsh and creates

essential habitat within the ecosystem, and The Wetlands Institute is required to match $25,345 in plant material to

complete the project.

​

Resource Values/Project Outputs: By raising the trail and restoring tidal salt marsh, this project will enhance critical ecosystem services,

including carbon sequestration, water filtration, and habitat provision for marsh-dependent species. The

restored marsh will also improve shoreline stabilization and provide a natural buffer against storm surge,

enhancing climate resilience for the Institute campus and nearby communities. Currently, the site includes

marsh areas with a range of potential for conversion, including areas that have ‘moderate’, ‘high’, and

‘highest’ potential, underscoring the importance of this project.

​

Cost/Budget: The total project cost is $3,075,227 with RGGI grant at $2,749,882; Borough of Avalon match of fill

at $300,000 and TWI match of $25,345. We are requesting funds for trees and shrubs at $25,345.

 

Schedule: Initiation of project in month/year - a timetable for completion of “x” years/months

Aniticpated start October, 2026 – construction through 4/2027; planting 4/2027 with 2 year post placement

monitoring.

​

Permit Status: NJDEP CAFRA Individual Permit; NJDEP Coastal Wetland Individual Permit, NJDEP Waterfront

Development Individual Permit – all issued March 2026; USACE Section 10/404 Individual Permit – submitted

10/2025, anticipated 10/2026.

​

List of Partners:

NJDEP, Borough of Avalon, University of Pennsylvania, AKRF.

What is requested from the CWRP/Contribution: $25,345 for native trees and shrubs.

 

Point of Contact: 

Lenore Tedesco, PhD

Executive Director

The Wetlands Institute

609-368-1211

ltedesco@wetlandsinstitute.org