Memorial Park Dam Removal

Project Purpose: Dam removal and restoration of stream to alleviate risks to public safety.
Brief Description: This restoration project involves the removal of a 15-foot-high dam and two smaller dams located downstream of the main dam. All of these serve as barriers to fish passage and negatively impact water quality, temperatures, and aquatic habitat. The dams will be removed to restore the natural stream flow through the site and eliminate the collection of excessive sediment in the current impoundment. The former impoundment will be restored to a natural stream through the addition of cross vanes, riffles and pools to restore a healthy, natural stream. Further, the addition of these features will provide enhanced aquatic habitat and fish habitat at the site. Public use of this area is very important to the community and active recreational use will be encouraged for fishing. The project involves extensive riparian restoration on both the northern and southern banks of the newly restored stream channel. This will include 0.86 acres of riparian meadow to serve as habitat for grassland birds and pollinator species on the northern bank. Additionally, the existing forested area to the south of the impoundment will be expanded by 0.24 acres of newly planted riparian forest to provide shading for the newly formed stream channel to reduce in-stream temperatures and improve water quality as well as provide habitat for herptile and amphibian species along the water’s edge.
Additionally, the dam has been classified as high-hazard and presents a danger to persons and property. In addition, the spillway does not meet DEP standards. The stream will be restored and the park will undergo major improvements, including walking trails, benches and signage. Fishing and birdlife will be increased dramatically, resulting in a healthier stream and wildlife habitat.
Resource Values/Project Outputs: The removal of the dam will restore the natural stream flow through the site and eliminate the poor water quality currently present within the impoundment due sedimentation and presence of waterfowl. When the former impoundment is restored to a natural stream through the addition of cross vanes, riffles and pools to restore a healthy, natural stream the resident fish populations will experience reduced temperature increased dissolved oxygen and improved habitat. Further, the addition of these features will provide enhanced aquatic habitat for benthic macroinvertebrates at the site.
Since the project site is a municipal park, it is a recreation destination. In its current condition with the heavy goose population, the conditions are not desirable for recreation and generally the water quality is so poor that the full benefits of the river cannot be enjoyed at the property. Post removal, the restored riparian meadow and forest will have an expanded walking trail that offers an increased recreational usage for exercise, fishing, and bird watching.
Cost/Budget: $3.47 million
Total Cost for Cedar Grove removal project is estimated to be $$3.47 million. The $25,000 in CWRP will be used only for construction costs associated with this project. Other activities for this removal project will be covered by a FEMA grant ($150,000), TNC Small Grants Program ($25,000). The remaining budget will be paid for by the Borough via a municipal bond. The Borough has requested $700,000 in NJDEP Green Acres funding to help support eh park revitalization components of the project. The town will be notified in May 2026 of the Green Acres funding availability.
Schedule:
2019: State requires action on the dam
2020–2021: Engineering studies and cost estimates completed
2022: Public meetings held; Borough Council approves dam removal
2022–2025: Design, permitting, and state review
2026: Final permits anticipated and project moves toward construction
Permit Status: Dam Safety permit received. The NJDEP GP16 Freshwater Wetlands permit for dam removal is expected in February. All permits are anticipated to be in hand by May.
List of Partners: The Nature Conservancy (technical support), Rippled Waters (project engineer), U.S. Fish and Wildlife Service (technical support), FEMA (financial support), Green Acres (pending financial support).
What is requested from the CWRP/Contribution: $25,000 for construction.
Point of Contact: Nancy Malool, Borough Administrator, nmalool@bernardsville.gov, 908-766-3000, ext. 206.