Gloucester County Water Quality Improvement through Enhanced Stormwater Management- GI projects (Glassboro, Woodbury)
Project Purpose: Stormwater is a significant issue for New Jersey and for communities with more than 10-15% impervious surfaces, it is even a bigger concern. Our overall effort focuses on five municipalities in Gloucester County which are also considered to be overburdened communities (Glassboro Borough, Paulsboro Borough, Woodbury, Deptford Township and Swedesboro Borough). Each municipality has greater than 20% impervious surfaces and three have greater than 30% impervious cover - 48.15% in Woodbury, 34.82% in Swedesboro Borough and 32.57% in Paulsboro Borough. With increased impervious surface comes increased flood risk from stormwater runoff. These targeted municipalities also have impaired waterways that carry nonpoint source pollution directly into either the Delaware or Maurice River that contributes to the overburden of pollution residents experience on a daily basis.
This project focuses on making the most improvement possible for the most vulnerable populations in Gloucester County by implementing a green stormwater infrastructure (GSI) project in each municipality to provide better stormwater management and improvements in water quality. For this project, ANJEC is requesting funding from CWRP to cover the cost of materials to install 2 Green Infrastructure projects in Glassboro and Woodbury. In Glassboro an existing detention basin at the municipal building will be
retrofitted with native plants and in Woodbury a vegetative filter strip will be installed at a public park. Funding will be for supplies including native plants, trees, seed, soil, stone, mulch, sand, trench drain, fencing and interpretive signage. The engineering, construction, and salary costs is being funded through a 2022 NJDEP stormwater grant – SW- ANJEC-00043.
Brief Description: These two targeted municipalities in Gloucester County lie within different subwatersheds -that drain into the Delaware and/or Maurice River; they are all prone to storm surges with increased costs for recovery. In a model proposed in a recent study (https://www.nature.com/articles/s41558-021-01265-6.pdf), Gloucester County is predicted to have an 89.6% raise in costs due to flood damage. Gloucester County municipalities are particularly vulnerable to the threats of climate change and increased frequency and intensity of storms as evident from devastation of Hurricane Ida that brought not only flooding but a tornado that touched down in four locations, making Gloucester County eligible for federal disaster assistance through FEMA. Nor’easters, heavy thunderstorms, and tropical storms have also recently caused flash floods in a number of these municipalities as seen in 2017, 2018, 2019 and 2020.
To address this issue, in March 2019, Governor Murphy signed into law the Clean Stormwater and Flood
Reduction Act which gives local government entities the ability to create Stormwater Utilities and establish fees to address the impact of stormwater runoff on localized flooding and the health of local waterways from existing development. However there has been push back from the public seeing that fees would be collected without any visible action taken to address stormwater. These projects can serve as a stepping off point for developing a stormwater utility feasibility study. ANJEC and its project partners understand that residents in OBC have historically had less influence on choosing the type of development in their neighborhoods. This lack of self-determination has led to a disproportionate burden of pollution, increasing their vulnerability to the impacts of climate changes, specifically flooding. OBCs, often are the first and worst hit by flooding, and are less resilient to recovery because of fewer financial
resources, fewer political connections, and less influence than their surrounding wealthier communities.
Each of these municipalities also have greater than 20% of their area comprised of overburdened communities. Woodbury has 6 identified census blocks that are overburdened over 30% low income in three blocks and over 45% minority in all six of the blocks. Glassboro has 6 identified census blocks that are overburdened with greater than 30% low income in five blocks and over 45% minority in four of the blocks. The focus on these municipalities, and specifically the OBC within these municipalities, prioritizes improving resiliency in disenfranchised communities. This prioritization is in alignment with ANJEC’s strategic plan to engage and elevate the voices of residents of OBCs to develop actionable solutions on environmental justice issues, such as addressing stormwater management and water quality from nonpoint source pollution. ANJEC will leverage our relationships with the ECs and green teams to promote the project and engage community members. For this NJCWRP proposal, ANJEC is requesting funding to offset material costs for 1 detention basin retrofit and 1 vegetative filter strip within the broader NJDEP stormwater grant – SW- ANJEC-00043.
A brief description of all five GI installations given below.
Cooper Street Park (650 Cooper Street, Woodbury). A 1745 sq ft vegetative filter strip will be installed at the Cooper Street Park. This location is within one of the OBC in Woodbury and within the Woodbury/Big Timber SubWatershed This rain garden will intercept 168,040 gallons of stormwater runoff a year to infiltrate it into the ground and remove pollutants such as sediment (29.75 lb/yr), nitrogen(1.09 lb/yr) and phosphorus (0.21ibs/yr). (pictured location in map to the right).
Glassboro Borough Municipal Building Parking Lot (1 South Main St, Glassboro). This location is within one of the OBC in Glassboro and within the Still Run/Little Ease Run SubWatershed. Approximately a 1425 sq ft section of the retention basin will be converted into a native herbaceous perennial garden to increase bioretention, and enhance the ecological value of the existing storm management system. (pictured location in map to the right).
Values/Project Outputs: The objective of these projects is to reduce nutrient and sediment loading to the Delaware River or Maurice watershed. Woodbury lies entirely in the Woodbury/Big Timber SubWatershed which flows into the Delaware. Glassboro lies within three subwatersheds: Mantua Creek, Raccoon Creek and Still Runn/Little Ease Run. The Mantua Creek and Racoon Creek which flows into the Delaware and the Still Run/Little Ease Run that flows into the Maurice River. The Municipal Building is located just inside of the Still Run/Little Ease Run SubWatershed very close to the Mantua Creek SubWatershed border.
The secondary objective is to elevate and promote green infrastructure to support the adoption of stormwater utilities, as an equitable way to finance the continued installation of green infrastructure.
Cost/Budget:
See detailed attached spreadsheet- one sheet for each of the 2 GI implementations. We are requesting funding for materials only (plants, trees, shrubs, seed, soil, mulch, stone, sand, fencing, trench drain and signage) – at a total cost of $19,276.5 which is 20% of total budget for both GI installations. The breakdown for each GI implementation is as follows:
Woodbury- total budget $47,423.41 requesting $8,891.5
Glassboro- total budget $48,916.91 requesting $10,385.00'
Schedule: Initiation of project in month/year - a timetable for completion of “x” years/months
-
January 2026 – finalize engineering designs for Woodbury and Glassboro
-
February 2026-March 2026– Get NJDEP final approval on all final engineering designs
-
April - May 2026– naturalize detention basin and install signage - Glassboro (ANJEC)
-
May- June 2026 - Install raingardens and educational signage at Swedesboro (SJLWT) and Deptford (ALS)
-
September 2026 – Install raingarden and educational signage in Paulsboro (ANJEC)
-
August 2026 – replace curb cut and install trench and pretreatment forbay area, remove sod
-
September - October 2026 – Install new planting for filter strip and install signage in Woodbury (ANJEC)
Permit Status: none needed
List of Partners:
Rutgers Cooperative Extension
Woodbury Township
Glassboro Township
What is requested from the CWRP/Contribution: $19,276.5
Point of Contact:
Jennifer M, Coffey, ANJEC Executive Director, jcoffey@anjec.org, (609) 532-3462